Thermador HMWN36FS Installation Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 35
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
HOOD W IDTH DIM. "W " DIM. "K " DIM. "Z"
30" 29 - 1/8" 2 - 1/2" 7 - 1/16"
36" 35 - 1/16" 2 - 1/2" 7 - 1/16"
48" 47 - 1/16" 2 - 1/2" 7 - 1/16"
Table 3
Side slot x 4
Figure 4b
Figure 4a
9
Wall Mount Installation
Note: see below if cabinet installation is preferred
3. After the hood installation height has been
determined draw a horizontal line at a distance
above the cooktop equal to the desired hood
installation height plus 7- 1/2”. See also Figure 4a.
4. Find the centerline of the cooktop. Draw a
vertical line along this centerline up to the hori-
zontal line drawn in step 1 and draw a vertical
line right and left at a distance of12-5/8” to
determine the mounting location of the
mounting hooks shipped with the hood.
5. Fit two mounting hooks on the wall to hang the
hood through the provided slots (2 wall
anchors + 2 hooks + 2 screws 5x35).
6. Run 10” Duct, long enough to reach the
transition once the hood has been installed plus
1 1/2” inch to connect ductwork. Fix Duct to
transition with screws and seal withtape.
7. Remove 1 of 2 knockouts and install 1/2”
conduit connector in j-box.
8. Hang the hood and adjust its position through
the screws on the hooks.
9. Fix the hood to 4 additional point, 2 on
upperside, 2 on lower side (use 4 wall anchors
+ 4washers + 4 screws 5x35).
Cabinet Installation:
Note: See above if wall mount installation is preferred
Note: Distances on Table 3.3.
Find the centerline of the cabinet bottom. Draw a line
along this centerline from rear to front of the cabinet.
See also Figure 4b.
4. Draw two lines, one at a K distance from the wall,
the other one at a Z distance from the previous line.
Mark 4 points, two along each line at a distance of
half W from the center line, to determine the screw
locations.
5. Fit 4 screws on cabinet bottom do not tighten
completely but leave a space of about 1/2” from
cabinet bottom surface and head screws.
6. Run 10” Duct, long enough to reach the transition
once the hood has been installed plus1 1/2” inch for
connect ductwork.
7. Remove 1 of 2 knockouts and install 1/2”conduit
connector in j-box.
8. Hang the hood on screws through side slots provided
on hood top. Tighten the four screws. Note: If possible
x the hood on the wall at 4 additional point (2 on
upper side, 2 on lowerside).
9. From the inside of the cabinet attach the transition
on upper outlet.
Center Hole
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 34 35

Comments to this Manuals

No comments