English 23
High Shelf Assembly
1. Remove protective plastic.
2. Slide the shelf onto the backguard panel.
3. Install the included stainless screws along the topside
of shelf and into the back of the shelf (Figure 26).
4. Begin with Backguard Installation.
Backguard Installation
1. Depending on model, remove the (3) or (5) T-20 Torx
stainless screws in the front face of the included Flush
Island Trim (Figure 27).
2. Remove the (4) drill point screws securing the trim to
the side panels, and the (3) or (4) drill point screws
securing the piece to the back panel. Lift up to fully
remove (Figure 28).
3. Align the back panel of the new accessory with the
flanges on the range side panels right and left rear
corners. The backguard is inserted inside the guide
channels on the back of the range (Figure 29).
4. Make sure the backguard’s front face is outside the
flange on the front side of the range.
5. Reinstall screws removed in Steps 1 and 2.
Figure 26: High Shelf Assembly
Figure 27: Flush Island Trim Front Face Screw Removal
Figure 28: Flush Island Trim Rear Screw Removal
Figure 29: Backguard Installation
Mounts inside
Mounts inside
side panel ange.
side panel ange.
Comments to this Manuals